Minuetto Train Door Control Units - Alstom Italy

Alstom asked TP Matrix to help after the Original Equipment Manufacturer (OEM) discontinued its repair service for faulty units, declaring them obsolete and in need of replacement.

The trains have been in service since 2004 with an expected service life of 35/40 years. The train manufacturer had expected the DCUs to last the life of the trains.

Alstom contacted us following previous work we’d carried out for them on similar DCUs.

After carrying out a condition assessment we found around 30 components to be at risk either from age, heat damage or wear. An obsolescence assessment was conducted and replacement components where sourced or alternatives (fit, form, function) were suggested.

TP Matrix was able to offer a repair solution that included a mandatory change out of at-risk components as well as development of bespoke test equipment.

Minuet Train Door Control Units - Alstom Italy

Shown below is a combined automatic and manual test box produced for Alstom Italy with an example of diagnostics output.