Jubilee Line trains nine-year overhaul project

Overview and objectives

TP Matrix is supporting Alstom with its nine-year overhaul of the 63 trains that serve the Jubilee Line. Our involvement in the overhaul is set to run until September 2024.

The main objectives are to significantly improve and extend the reliability of the fleet until 2036, possibly longer, thereby reducing ongoing maintenance costs and improving operational performance.

TP Matrix’s approach – overcoming obsolescence and providing rigorous testing

​As expected, with the Jubilee Line fleet being in service since 1997, a number of electronic component obsolescence issues were identified while developing the scope of work for the overhaul.

TP Matrix worked closely with Alstom’s engineering team and presented like-for-like alternatives which were then trialled and subsequently approved through Alstom’s design query process.

The products being overhauled by TP Matrix for each train set include:

Auxiliary converter electronics

Wheel slide and speed control units

Power supply units

Gate drive panels

Thyristor firing panels

Weekly, TP Matrix will receive 70 individual PCBs with 1,065 components being replaced.